One waterproofing job triggers five separate WHS obligations.
Confined space, working at heights, hazardous chemicals, isocyanates and silica. This pack documents every one.
Ten editable compliance documents — SWMS, hazardous chemical and heights risk assessments, confined space permit and rescue plan, isocyanate health monitoring and a silica control plan — written by a Certified Industrial Hygienist and ready for upload to builder compliance portals. Buy only what you need, or take the full pack at 20% off.
Start with what you need
Not every job enters a confined space or sprays isocyanates. Every document is sold individually — same instant download, same editable Word format, same single-site licence. Buy one, buy three, or buy all ten. The 20% bundle discount applies only when all ten are purchased together.
Safe Work Method Statement
The document every builder asks for first. Task-specific SWMS covering internal wet-area, balcony, roof, tanking and remedial waterproofing, mapped to WHS Regulation s291 and aligned to AS 3740 and AS 4654.
Isocyanate Health Monitoring Program
Health monitoring for workers exposed to isocyanates in spray and injection PU/polyurea membranes is a mandatory requirement under WHS Regulation Schedule 14 — not optional. Trigger criteria, respiratory questionnaire and spirometry pathway included.
Confined Space Entry Permit & RA
Lift pits, tanks and basements are confined spaces. This entry permit and risk assessment meets reg 66/67 and AS 2865 — atmospheric testing, isolation, standby-person and entry-supervisor roles, and permit close-out.
Silica (RCS) Exposure Control Plan
Grinding and preparing concrete substrates before membrane application generates respirable crystalline silica. This control plan meets the crystalline-silica-substance duties in force from 1 September 2024, with on-tool extraction and air-monitoring triggers.
Or take the complete pack and save 20%
Buying four or more documents? The full pack costs less than assembling them one by one — and it means a builder never finds a gap in your paperwork.
For waterproofing contractors who want the whole compliance surface covered in one download — internal wet-area, balcony, roof, tanking and remedial work, including confined-space and spray-membrane jobs.
- ✓All 10 documents
- ✓Confined space permit + rescue plan
- ✓Isocyanate health monitoring program
- ✓Silica (RCS) control plan
- ✓Single-site licence
- ✓Instant download
- ✓12-month regulatory updates
Every document in the pack is also sold on its own. The complete edition simply bundles all ten at 20% below the à la carte total, so nothing is missing when a principal contractor reviews your SWMS and supporting documents.
Waterproofing is higher-risk than it looks
To a builder it’s just “the membrane”. To a WHS regulator it’s a stack of high-risk activities in one trade: crews work above 2 m on balconies and roofs, enter lift pits and basements that are confined spaces, spray polyurethane and polyurea that off-gas isocyanates, and grind concrete substrates that release respirable crystalline silica.
Each of those is separately regulated. Isocyanate exposure carries a mandatory health monitoring duty under WHS Regulation Schedule 14; silica sits under the crystalline-silica-substance duties in force from 1 September 2024; confined-space entry demands a permit and a rescue plan. A generic construction SWMS covers none of it in the detail an inspector or principal contractor expects.
- ✓A task-specific SWMS mapping activities to s291
- ✓A hazardous chemical risk assessment and SDS register
- ✓A working-at-heights risk assessment and fall plan
- ✓A confined space entry permit with a rescue plan
- ✓An isocyanate health monitoring program
- ✓A respirable crystalline silica control plan
The complete pack covers all six — and adds the toolbox talks and the plant pre-use checklists that finish the file. Or buy just the documents that fill your gaps.
All ten documents
Buy any of these on its own, or take the lot at 20% off. Fill in your business name, complete the variable fields, brief your crew, and file it. The first inspection or portal upload it survives pays it back several times over.
Safe Work Method Statement
The anchor document. Covers internal wet-area, balcony, roof, tanking and remedial waterproofing, mapping each high-risk activity to WHS Regulation s291 with hierarchy-of-controls measures and sign-on.
Hazardous Chemical Risk Assessment
Structured hazardous-chemical assessment for membrane systems — polyurethane and polyurea isocyanates, epoxy resins, amine hardeners, solvent primers and bitumen — with exposure controls and PPE/RPE selection.
SDS & Hazardous Chemical Register
Editable SDS and hazardous chemical register for the products carried on site — manifest quantities, hazard classes and current-SDS tracking under WHS Regulation Chapter 7.
Toolbox Talk Pack
Ready-to-deliver talks covering membrane chemistry, heights on balconies and roofs, confined-space entry, silica from substrate prep and correct PPE/RPE — with attendance and consultation records.
Working-at-Heights Risk Assessment
Fall-prevention assessment for balcony, podium and roof waterproofing above 2 m. Edge protection, EWP and harness controls, exclusion zones and a fall-prevention plan template.
Plant & EWP Pre-Use Checklist Set
Pre-start and pre-use inspection checklists for EWPs, concrete grinders and scabblers, LPG torching equipment and mixing plant — with defect tagging and daily records.
Confined Space Entry Permit & RA
Entry permit and risk assessment for lift pits, tanks, basements and enclosed shells (reg 66/67, AS 2865). Atmospheric testing records, isolation, standby-person and supervisor roles, and close-out.
Permit requiredConfined Space Rescue Plan
The non-negotiable companion to the entry permit — rescue method and equipment, trained personnel, communication protocol, retrieval systems and emergency-services interface.
Isocyanate Health Monitoring Program
Mandatory under WHS Regulation Schedule 14 for spray and injection PU/polyurea work. Trigger criteria, respiratory questionnaire, spirometry pathway and exposure-record templates.
Mandatory — Schedule 14Silica (RCS) Exposure Control Plan
Respirable crystalline silica control for grinding and preparing concrete substrates. On-tool extraction and water suppression, air-monitoring triggers against the 0.05 mg/m³ WES, and a review schedule.
Why this pack and not a generic construction SWMS
There are dozens of WHS template providers in Australia. Almost none write to the specific hazards waterproofing creates, and almost none include the isocyanate health monitoring program and confined space rescue plan the trade actually needs.
Frequently asked questions
Don’t let a paperwork gap stop the job at the gate.
Principal contractors reject SWMS packages that miss the confined space permit, the isocyanate health monitoring or the silica plan. Assembling all ten documents from scratch — permits, registers, health monitoring — takes weeks. This pack has them ready today.
Start with the document that closes your biggest gap — or take the full pack and save 20%.
All prices AUD, GST exclusive · Instant download · Single-site licence · 12 months of regulatory updates included
This pack provides documentation tools to support due diligence. It does not certify compliance. Compliance with airborne contaminant exposure limits can only be verified through site-specific air monitoring, and confined-space and health-monitoring duties must be discharged on site by competent persons. See full Disclaimer & Terms of Use within each downloaded document.